Moinho de Vento Flats is a private condominium comprising 15 residential units, located in one of the most sought-after areas of Leça da Palmeira.
Situated next to the Forte de Leça da Palmeira, just 200 meters from the beach and the iconic tidal pools, this new development offers a prime location, surrounded by the area’s best restaurants and the Naval Club.
A project designed for those who value location, quality of life, and contemporary architecture, in the heart of Leça da Palmeira.
Project ConceptMoinho de Vento Flats emerges from the redevelopment of the former Padaria Leixões, on Rua do Moinho de Vento, complemented by the construction of a new building facing Travessa dos Dois Amigos.
The project preserves the original identity of the complex, maintaining its volume, main façade, and entrance through the side courtyard, creating a carefully balanced blend of heritage and modernity.
FinishesCoveringsFlooring - Dry areas: 12 mm AC5 floating floor
- Wet areas: Marmocim tiles 20 x 20 cm
- Outdoor areas: concrete slabs
- Stairs and common areas: polished and varnished screed with wall paneling
Walls - Dry areas: painted plasterboard
- Kitchens: countertop and backsplash in compact marble agglomerate
- Bathrooms: white tiles 10 x 10 cm and painted plasterboard
Ceilings - Dry areas: false ceilings in plasterboard
- Wet areas: moisture-resistant plasterboard false ceilings
Bathrooms - Wall-hung sanitary ware by Sanindusa or equivalent
- Lacquered MDF cabinet
- White shower tray with glass enclosure
Carpentry and Frames - Interior doors and wardrobes in lacquered MDF
- Security entrance doors
- Rua do Moinho de Vento façade in thermal render and existing stone
- Remaining façades in painted ETICS (capoto system)
- Window frames on Rua do Moinho de Vento in lacquered wood
- Remaining window frames in lacquered aluminium with double glazing and thermal break
- Painted metal railings on balconies and terraces
Equipment and Comfort - Candy appliances or equivalent
- Efapel electrical materials or equivalent
- LED spotlights and recessed lighting
- Video intercom system
- Domestic hot water heating via heat pump
- Stainless steel sink and single-lever OFA mixers or equivalent
- Individual air conditioning system (multi-split)
- Shared condominium lounge with kitchenette and laundry
Construction Timeline - Estimated start: September 2026
- Estimated completion: Second half of 2027
Payment Conditions - 20% upon signing the promissory contract
- 15% upon completion of the structure
- 15% upon installation of window frames
- 50% upon deed execution